Transport for NSW, Macquarie Park required a fire engineering solution for a government office fitout – while maintaining the open, collaborative workspace design essential for modern public sector operations.
The project involves the fitout of Levels 7 and 8 of a commercial office building at 7 Harvest Street, Macquarie Park. The scope of works includes flexible work zones, secure tender rooms, meeting/training rooms, a community hub, kitchen and amenities, and a town hall on Level 8. The base building is a multi-storey commercial office tower with basement and mezzanine-level parking, ground-floor retail, and office spaces from Levels 1 to 8. The building features an atrium void that extends from the ground floor to Level 8, with the void at Level 8 being enclosed with glazed construction. Three fire-isolated stairwells serve the upper floors.