The project at 56a The Esplanade, Ettalong Beach, involves the development of a four-storey residential building with a basement level.

The primary frontage of the building faces The Esplanade, while vehicular access to the basement is provided via Broken Bay Road. The project required a comprehensive fire engineering assessment to address compliance with the Building Code of Australia (BCA) and ensure the implementation of necessary fire safety measures.

Key Fire Safety Challenges:

  • Protection of Openings in External Walls: Several openings within 3m of the adjacent allotment boundary did not comply with BCA Clause C3.4.
  • Lift Door Insulation: The lift shaft required a 90/90/90 FRL rating, but lift doors on Level 1 only achieved an FRL of -/60/-.
  • Egress Compliance in Basement: The basement provided only a single exit instead of the required two, with extended travel distances up to 34m instead of the allowable 20m.
  • Fire Hydrant System Compliance: The project proposed compliance with AS 2419.1:2021 instead of AS 2419.1:2005, requiring justification under the fire engineering approach.

Project Outcomes:

  • BCA Compliance Achieved: The fire engineering strategies successfully addressed all identified DtS non-compliances.
  • Enhanced Fire Safety Measures: Upgraded alarm systems and strategic use of sprinklers improved occupant safety beyond standard compliance levels.
  • Improved Emergency Egress: Performance-based solutions ensured equivalent or better evacuation times compared to standard compliance requirements.
  • Future-Proofed Fire Protection: Adoption of AS 2419.1:2021 positioned the project in alignment with anticipated regulatory changes.

Fire Engineering Solutions:

  • Heat Attenuation Screens: Unprotected openings were justified through thermal radiation analysis, with specific windows protected by attenuation screens to mitigate fire spread.
  • Sprinkler Protection for Lift Doors: Fast-response sprinkler heads were installed near lift doors on Level 1 to enhance fire resistance and limit heat transfer.
  • Optimised Egress Startegy : An advanced Building Occupant Warning System with voice alarms was implemented to offset the extended egress distances, coupled with emergency lighting and signage improvements.
  • Fire Hydrant System Justification: The adoption of AS 2419.1:2021 was supported by fire engineering analysis and deemed equivalent or superior to AS 2419.1:2005, aligning with future BCA amendments.

A Benchmark in Fire Engineering for Residential Developments

The fire engineering solutions implemented for 56a The Esplanade, Ettalong Beach, demonstrate a well-balanced approach to safety, regulatory compliance, and design efficiency. Through advanced risk assessment methodologies and strategic fire protection measures, the project establishes a high standard for fire safety in mixed-use residential developments.

Other projects
63 Ann Street, Surry Hills, NSW

63 Ann Street, Surry Hills, NSW

39 Park Street, Narrabeen

39 Park Street, Narrabeen, NSW

HC Coombs Centre

Reserve Bank of Australia, H.C. Coombs Centre, NSW

It's time

Ready to put fire safety first?

Book a 60 minute training session over lunch to get your team of PM’s upskilled.