26-28 Curwen Terrace, Chermside QLD

Sector

Residential

Location

Chermside, QLD

This residential project at 26-28 Curwen Terrace, Chermside, QLD, required a fire safety solution as innovative as its design.ย 

Our fire engineering approach balanced the needs of modern living with compliance measures to ensure safety and flexibility for this 10-storey residential development with basement carpark facilities.

๐—ง๐—ต๐—ฒ ๐—–๐—ต๐—ฎ๐—น๐—น๐—ฒ๐—ป๐—ด๐—ฒ๐˜€:

โ†’ Mixed-use fire separation: Ensuring safe integration of Class 2 residential spaces and Class 7a carpark areas, particularly where glazing and fire walls intersect.
โ†’ Modern materials and systems: Accommodating PVC ductwork and balcony blinds while mitigating fire risk.
โ†’ Egress pathways: Extending exit travel distances and refining discharge points while optimising evacuation safety.

๐—ง๐—ต๐—ฒ ๐—ฆ๐—ผ๐—น๐˜‚๐˜๐—ถ๐—ผ๐—ป๐˜€:

โ†’ Performance-based fire separation: Fire-rated walls with external wetting sprinklers and toughened glazing to separate the residential and carpark areas.
โ†’ Innovative material solutions: Allowing PVC ducts in concealed spaces with stringent material performance criteria and enhanced sprinkler protection.
โ†’ Improved egress design: Rationalising exit travel distances and additional fire-rated lobbies to optimise fire-isolated stairway discharge locations in order to maximise entry foyer flexibility.

๐—ง๐—ต๐—ฒ ๐—ข๐˜‚๐˜๐—ฐ๐—ผ๐—บ๐—ฒ๐˜€:

โ†’ Enhanced safety and compliance: A Performance Solution achieving compliance with the NCC 2019 Amendment 1, safeguarding both residents and visitors.
โ†’ Architectural integration: Ensuring that modern material choices and design features, such as balcony blinds, align with fire safety requirements.
โ†’ Future-ready residential spaces: A building designed with long-term peace of mind for all occupants.ย 

59 Collings Street, Balmoral, QLD

Sector

Residential

Location

Balmoral, QLD

This multi-level residential project at 59 Collings Street, Balmoral, called for an innovative fire engineering approach to overcome the challenges of a modern Class 2 residential building with associate carpark facilities.ย 

Our strategy focused on ensuring compliance with fire safety standards, including supporting EV Charing Station installation, while respecting the architectural vision and functional requirements of the design.

๐—ง๐—ต๐—ฒ ๐—–๐—ต๐—ฎ๐—น๐—น๐—ฒ๐—ป๐—ด๐—ฒ๐˜€:

โ†’ Boundary proximity and fire separation: Managing openings in external walls and carpark exhaust grilles within 3m of the allotment boundary required specialised protective measures.
โ†’ Extended egress distances: Deviations in travel distances for exits on basement and ground levels needed a performance-based assessment to demonstrate safe evacuation.
โ†’ Innovative design features: Addressing the insulation criteria of lift doors in apartment bounding construction and supporting the central stairway discharge design.

๐—ง๐—ต๐—ฒ ๐—ฆ๐—ผ๐—น๐˜‚๐˜๐—ถ๐—ผ๐—ป๐˜€:

โ†’ Custom fire protection solutions: Implementation of fire-rated wing walls and fire attenuation screens to minimise radiant heat to and from allotment boundaries.
โ†’ Enhanced egress provisions: Increased exit travel distances supported by fire-rated separation and improved detection systems.
โ†’ Specialised safety measures: Provisions for electric vehicle charging stations in the carpark, ensuring safety and compliance with National Construction Code (NCC) and best practices.

๐—ง๐—ต๐—ฒ ๐—ข๐˜‚๐˜๐—ฐ๐—ผ๐—บ๐—ฒ๐˜€:

โ†’ Code-compliant safety design: A performance-based fire safety solution aligned with the NCC 2022, ensuring full compliance without compromising design intent.
โ†’ Long-term safety: Robust fire safety measures that protect building occupants and infrastructure now and into the future.
โ†’ Functional and future-ready spaces: A thoughtfully designed residential and carpark facility supporting modern living and evolving technology.ย ย 

43 Wambool Street, Bulimba, QLD

Sector

Residential

Location

Bulimba, QLD

This residential apartment project at 43 Wambool Street, Bulimba, QLD required a tailored fire safety strategy to address the challenges of modern residential design within a compact, multi-level structure.ย 

Our approach balanced the requirements of compliance with the architectural vision.

๐—ง๐—ต๐—ฒ ๐—–๐—ต๐—ฎ๐—น๐—น๐—ฒ๐—ป๐—ด๐—ฒ๐˜€:

โ†’ Mixed-use fire safety: Class 2 residential spaces with a Class 7a basement carpark.
โ†’ Performance-based compliance: Addressing deviations from prescriptive DtS provisions, including fire separation, exit travel distances, and fire hydrant configurations.
โ†’ Innovative compartmentation: Managing fire shutter designs that exceed traditional lengths and lacked insulation criteria to support spatial efficiency.

๐—ง๐—ต๐—ฒ ๐—ฆ๐—ผ๐—น๐˜‚๐˜๐—ถ๐—ผ๐—ป๐˜€:

โ†’ Enhanced fire protection systems: Wall wetting sprinklers paired with fire-rated shutters to ensure fire compartmentation while optimising design flexibility.
โ†’ Custom egress designs: Rationalised exit travel distances and optimised fire-isolated stairway discharge pathways to support compliance and architectural design.
โ†’ Hydrant booster redesign: Strategically positioned fire hydrant system with rationalised enclosures to meet safety standards while accommodating site constraints.

๐—ง๐—ต๐—ฒ ๐—ข๐˜‚๐˜๐—ฐ๐—ผ๐—บ๐—ฒ๐˜€:

โ†’ Regulatory compliance: A performance-based solution aligned with NCC 2019 Amendment 1 and QFD requirements.
โ†’ Safety-first approach: A residential building with enhanced fire safety measures ensuring protection for residents and visitors alike.
โ†’ Future-ready apartments: A design that meets modern living standards while prioritising fire safety and operational efficiency.ย ย 

470 Lytton Road, Morningside QLD

Sector

Industrial

Location

Morningside, QLD

This existing industrial development at 470 Lytton Road, Morningside, QLD, required a carefully crafted fire safety strategy to enhance an existing warehouse into a safer facility.

Our approach considered the unique characteristics of the building and its dated fire safety systems, integrating modern compliance measures while supporting operational efficiency with a pragmatic approach.

๐—ง๐—ต๐—ฒ ๐—–๐—ต๐—ฎ๐—น๐—น๐—ฒ๐—ป๐—ด๐—ฒ๐˜€:

โ†’ Aging fire systems: The buildingโ€™s existing fire hydrant and sprinkler systems dated back decades, requiring significant upgrades to meet current safety standards.
โ†’ Decommissioning smoke exhaust fans: Outdated ceiling-mounted exhaust systems were inadequate, demanding innovative alternatives for smoke hazard management.
โ†’ Extended egress distances: Modifying exit travel pathways in the warehouse to accommodate modern operational layouts and fire safety requirements.ย 

๐—ง๐—ต๐—ฒ ๐—ฆ๐—ผ๐—น๐˜‚๐˜๐—ถ๐—ผ๐—ป๐˜€:

โ†’ Hydrant and sprinkler upgrades: Retrofitting fire safety systems to achieve compliance with AS 2118.1:2017 and AS 2419.1:2005, improving pressure, coverage, and functionality.
โ†’ Modern smoke detection systems: Installing smoke detectors throughout the building, ensuring early hazard identification and reduced alarm times.
โ†’ Optimised egress design: Performance-based assessments allowed for extended travel distances, supported by improved detection systems and fire management strategies.

๐—ง๐—ต๐—ฒ ๐—ข๐˜‚๐˜๐—ฐ๐—ผ๐—บ๐—ฒ๐˜€:

โ†’ Enhanced safety: The building now features modernised fire systems that provide appropriate protection for occupants and assets.
โ†’ Regulatory compliance: All fire engineering modifications align with Section 68 of the Building Act 1975, securing compliance while respecting the buildingโ€™s existing structure.
โ†’ Future-ready design: The improvements ensure Building 11 as part of the precinct is well-equipped to serve operational needs safely and efficiently for years to come.ย 

383 Wickham Terrace, Spring Hill

Sector

Residential / Adaptive Reuse

Location

Spring Hill, QLD

This remarkable redevelopment project at 383 Wickham Terrace, Spring Hill, QLD, called for a customised fire safety strategy to accommodate the unique challenges of transforming an existing office building into a modern residential development.ย 

Our fire engineering approach was meticulously developed to ensure compliance with fire safety requirements while supporting the innovative design and a pragmatic approach.

๐—ง๐—ต๐—ฒ ๐—–๐—ต๐—ฎ๐—น๐—น๐—ฒ๐—ป๐—ด๐—ฒ๐˜€:

โ†’ Mixed-use adaptation: Conversion of an 8-storey office building into a residential building (Class 2), with a carpark (Class 7a) and additional penthouse storeys.
โ†’ Complex site conditions: Existing building elements, structure and exits coupled with limited floor area to accommodate building infrastructure.
โ†’ Performance deviations: Addressing existing construction and innovative design, including timber framing for penthouse levels, trellis vegetation, EV Charging Stations and extended egress travel distances.

๐—ง๐—ต๐—ฒ ๐—ฆ๐—ผ๐—น๐˜‚๐˜๐—ถ๐—ผ๐—ป๐˜€:

โ†’ Fire Services: Custom solutions to support rationalised and modified fire services with a keen consideration of spatial limitations in the existing building.
โ†’ Enhanced safety for EV chargers: Special provisions for carpark safety, including measures for electric vehicle charging stations to mitigate fire hazards.
โ†’ Innovative design flexibility: Allowing the inclusion of non-combustible trellises with climbing vegetation and timber-framed penthouse walls while maintaining safety.

๐—ง๐—ต๐—ฒ ๐—ข๐˜‚๐˜๐—ฐ๐—ผ๐—บ๐—ฒ๐˜€:

โ†’ Future-ready design: A building that seamlessly integrates modern residential amenities while prioritising fire safety.
โ†’ Compliance achieved: All performance solutions meet the performance requirements of the National Construction Code (NCC) 2022.
โ†’ Safety without compromise: Retention of the existing building through a considered adaptive reuse strategy where fire safety is centralย ย 

TS Vampire, Tweed Head NSW

Sector

Defence

Location

Tweed Heads South, NSW

This unique refurbishment project at 111 Dry Dock Road, Tweed Heads South, NSW, required a tailored fire safety solution.ย 

Our approach carefully considered the constraints of an existing Class 9b fire strategy while accommodating the buildingโ€™s new mixed-use functionsโ€”all in support of its critical role in cadet training and administration.

๐“๐ก๐ž ๐‚๐ก๐š๐ฅ๐ฅ๐ž๐ง๐ ๐ž๐ฌ:

โ†’ The buildingโ€™s change-in-use: Converting portions of the Ground Floor to Class 3 accommodation for cadets, alongside maintaining Class 5 office and Class 9b training/lecture spaces, demanded compliance with updated fire safety standards.
โ†’ Retrofitting fire ratings: The buildingโ€™s blockwork construction required significant upgrades to meet the fire resistance levels (FRL) for modern use, particularly in areas now serving as accommodation.
โ†’ Egress provisions: Modifying the design to ensure safe and efficient evacuation, while maintaining the buildingโ€™s architectural integrity, was a key focus.ย 

๐“๐ก๐ž ๐’๐จ๐ฅ๐ฎ๐ญ๐ข๐จ๐ง๐ฌ:

โ†’ Enhanced fire separation: Upgraded blockwork walls and ceiling systems, incorporating fire-rated plasterboard and mastic sealing to mitigate fire spread.
โ†’ Direct egress routes: Each accommodation unit now includes direct access to the outside for enhanced occupant safety.
โ†’ Improved fire detection and warning systems: Existing systems were upgraded to meet modern standards, including ceiling-mounted smoke detectors and enhanced occupant warning systems tailored to the buildingโ€™s unique needs.

๐“๐ก๐ž ๐Ž๐ฎ๐ญ๐œ๐จ๐ฆ๐ž๐ฌ:

โ†’ Compliance without compromise: The Performance Solution ensured the building met relevant standards under the NCC 2022 and Defence guidelines.
โ†’ Safety-first design: Occupants benefit from robust fire safety measures, including early detection and efficient evacuation pathways.
โ†’ A multi-functional space: The refurbished building supports Defence operational needs, offering flexible use for training, lectures, and accommodation.ย 

It's time

Ready to put fire safety first?

Book a 60 minute training session over lunch to get your team of PMโ€™s upskilled.